Thursday, September 11, 2008
the stuff
the carpet for the basement & bedrooms, the granite for the wet bar, the slate for in front of the wet bar, the cherry wood for the cabinets in the wet bar, stone for fireplace
tile for master bathroom
dining room table
construction, day 5 (or so)
Wednesday, September 3, 2008
Tuesday, September 2, 2008
inside pictures (before construction)
main floor, dining/living area (master bedroom through doorway next to fireplace)
family room/tv area
entry way/powder room
looking from front door to dining room/kitchen (bar being removed)
main floor fireplace
current laundry room, will be converted to 3rd bedroom




bedroom #2
current family room in basement, future site of a 60" plasma, sectional couch, shuffle board table with wet bar around to the left (that framing will be removed and so will the wall on the left past the doorway)
out to backyard/patio (that's the locksmith pictured below)
site of new laundry room
basement bathroombedroom #2
Subscribe to:
Comments (Atom)

